Legal & Compliance

Terms of Service

Governing online quotations, ocular measurements, custom aluminum & glass fabrication, and on-site installations in accordance with Philippine Laws.

Last Updated: October 2026 · Operating in the Republic of the Philippines

1. Business Identification & Statutory Disclosures

In compliance with Republic Act No. 11967 (The Internet Transactions Act of 2023) and the Department of Trade and Industry (DTI) regulations, this digital platform is operated by JBM Glass and Aluminum Services ("JBM", "we", "us", or "our").

  • Primary Service Area: Pampanga, Tarlac, Bulacan, Bataan, Nueva Ecija, and Central Luzon / Greater Metro Manila.
  • Official Telephone: 0915 645 1279
  • Official Email: eg.montero@yahoo.com
  • Official Social Channel: facebook.com/profile.php?id=61593096043703

2. Preliminary Estimates vs. Binding Contracts

Pursuant to the Consumer Act of the Philippines (Republic Act No. 7394) and the Electronic Commerce Act of 2000 (Republic Act No. 8792):

Important Disclaimer: All pricing outputs, calculators, and dimensional totals generated through our online configurators are non-binding preliminary estimates designed for client budgetary planning. Submitting a quote cart does not constitute a perfected contract of sale or dispatch commitment.

Final binding contract pricing is only formalized after:

  1. A phone consultation with our technical estimating team.
  2. Actual physical ocular inspection and millimeter measurement of finished wall openings by an authorized JBM technician.
  3. Verification of structural conditions, glass thickness requirements, floor levels, scaffolding, and site access.
  4. Execution of a formal written quotation or contract signed by both parties.

3. Mandatory Phone Consultation Prior to On-Site Dispatch

To prevent unnecessary mobilization expenses and ensure mutual alignment on project scope, JBM operates under a mandatory telephone consultation first policy. An authorized representative will call the client at the provided Philippine mobile number to verify specs, preliminary costs, and installation readiness before committing technicians to travel.

JBM reserves the right to decline or reschedule ocular visits if the customer is unreachable, the project site is outside our current operational service radius, or preliminary dimensions are structurally unfeasible.

4. Site Readiness, Rough Openings & Measurement Validity

Custom aluminum profiles and glass units are manufactured to precise millimeter tolerances. Accurate fabrication depends entirely on the condition of your building rough openings:

  • Finished Masonry: Concrete hollow block (CHB), lintel beams, and jambs must be fully plastered, square, level, and plumb prior to final ocular measurement.
  • Post-Measurement Alterations: If the client or their general contractor modifies, replasters, tiles, or alters any window or door opening after JBM has taken final measurements, any required modifications, remakes, or delays will be billed entirely to the client.
  • Obstructions: The client must ensure safe, clear physical access to all window and door openings during measurement and installation.

5. Subdivision, HOA & Condominium Entry Clearances

Many residential subdivisions, gated villages, and condominium developments in the Philippines enforce strict homeowner association (HOA) construction and visitor entry rules:

  • Client Obligation: The client is solely responsible for securing HOA gate passes, contractor work permits, elevator service bookings, and paying any required HOA security bonds or environmental fees.
  • Turn-Away & Mobilization Charges: If JBM technicians or delivery personnel are refused entry at the village gate or condominium security due to unarranged passes, the mobilization and rescheduling fee will be charged to the client.

6. Custom Fabrication & Non-Refundability (Civil Code Arts. 1713–1731)

In accordance with the Civil Code of the Philippines governing Contracts for a Piece of Work (Articles 1713 to 1731):

  • Bespoke Nature: All aluminum window profiles, swing doors, shower enclosures, and glass panels are tailor-made and custom-cut to the specific dimensions of the client's site. They cannot be returned, restocked, or resold to other parties.
  • Production Downpayment: Physical extrusion cutting, powder coating, and glass tempering kiln runs commence only upon receipt of the agreed initial downpayment (typically 50% unless otherwise agreed in writing).
  • Cancellation Policy: Once material cutting or glass tempering has commenced, the contract cannot be canceled unilaterally. Any cancellation will result in the complete forfeiture of the downpayment to cover consumed raw materials and shop labor.

7. Building Code & Safety Glazing Standards (PD 1096 & PNS 193)

JBM adheres to Presidential Decree No. 1096 (National Building Code of the Philippines) and the Bureau of Philippine Standards (PNS 193 / PNS 130) regarding architectural safety glass.

For high-impact hazard zones—including full-height sliding doors, swing doors, shower enclosures, and floor-to-ceiling glass walls—JBM reserves the right to mandate the use of tempered safety glass or laminated glass. JBM will not execute configurations that compromise structural safety, wind load resistance, or human impact protection.

8. Force Majeure & PAGASA Weather Halts

Exterior aluminum window and glass installations pose severe safety hazards during inclement weather. JBM shall not be liable for delivery or installation delays resulting from acts of God, severe monsoons, tropical cyclones (PAGASA storm signal warnings), earthquakes, government-declared holidays, supply chain material shortages, or impassable road conditions. Work will resume as soon as site safety is restored.

9. Limited Warranty & Workmanship Guarantee

We stand behind our fabrication quality:

  • Aluminum Profiles: Guaranteed against material manufacturing defects, structural warping, or premature powder coat delamination under normal residential conditions.
  • Hardware & Accessories: Rollers, locks, hinges, and friction stays are covered by a one (1) year functional replacement warranty.
  • Exclusions: Warranty does not cover glass breakage caused by thermal shock, physical impact, typhoons, vandalism, building settlement structural cracks, or modifications made by unauthorized third parties.

10. Governing Law & Jurisdiction

These Terms of Service and all related agreements shall be governed by and construed in accordance with the laws of the Republic of the Philippines. Any dispute, claim, or controversy arising out of or relating to these terms shall be settled amicably, failing which, the venue of any legal action shall exclusively be the proper courts of the Province of Pampanga, to the exclusion of all other courts.

Questions About Our Terms?

Reach our customer service and estimation desk directly:

Phone: 0915 645 1279 · Email: eg.montero@yahoo.com